Lieberman Retirement Community, located in Illinois, had plans to install a new dish machine in their dish washing area.  They opened up the concrete floor toservice the drains in the area and then filled in the hole with high early concrete. JetRock Authorized Installers, Superior Hard Surface Solutions LLC out of Dayton, Ohio, took over from there. JetRock installers filled the remaining low area in the floor left from the damaged and no longer bonded quarry tiles and filled in around the drains with an epoxy sloping kit. All remaining quarry tile that had good bond was cleaned and diamond grinded to ensure a long durable JetRock epoxy install. The total time from removal of the old dish equipment to having the new dish equipment up and running was less than 48 hours.

Skip to content